Advanced Technology Consultants
A Superior Source of Knowledge

In-house Professional Training on Automotive & Aerospace Topics               New Product Evaluation on its Criticality Within the Technology Sector, Competitiveness, & Market Demand               Business Analysis for Investment Purposes               Comprehensive Evaluation of Corporate R&D  for Effectiveness, Innovative Performance/Attributes, and Future Success               Training on Management of R&D               Technology Roadmapping              Integrated  R&D and Corporate Strategic Planning               Comprehensive Evaluation of the Disruptiveness Potential of New Technologies               Benchmarking Corporate Board of Directors               Combustion &  Emission of Pollutants               Consulting on Advanced Technologies               Nanotechnology and Applications in Fuels & Propellants                Ignition Technologies for Engines               Gas Turbine Combustion and Emission of Pollutants               Liquid Atomization & Fuel Injection               Management of Innovation               Expert Witness in Legal Matters              Feasibility and  Economic Analysis               Propulsion Systems Design               Systems Engineering in Design & Project Management               Technical and Fundamental Analysis of Financial Market               Composite Materials, FRP, and Pressurized Composite Gaseous Fuel Storage             Car Accident Reconstruction               home | help | email

home
** HOMEPAGE **
Why ATC?
Technology
Service Areas
Products/Services
Clients
News
Personnel
Contact
ATC Images

Welcome to

 

Advanced Technology Consultants



Laguna Niguel, California
USA    92677
Tel: 949 467 9233
(001 prefix outside USA)



Lugano, Ticino
Switzerland 6900

 

 

Tunnel Boring Machines (TBM)

Excavation by tunnel boring machine (TBM) 

A TBM is a complex set of equipment assembled to excavate a tunnel. The TBM includes the cutterhead, with cutting tools and muck buckets; systems to supply power, cutterhead rotation, and thrust; a bracing system for the TBM during mining; equipment for ground support installation; shielding to protect workers; and a steering system. Back-up equipment systems provide muck transport, personnel and material conveyance, ventilation, and utilities. 

(1) The advantages of using a TBM include the following: 

  • Higher advance rates

  • Continuous operations

  •  Less rock damage

  • Less support requirements

  • Uniform muck characteristics

  • Greater worker safety

  • Potential for remote, automated operation. 

(2) Disadvantages of a TMB are the fixed circular geometry, limited flexibility in response to extremes of geologic conditions, longer mobilization time, and higher capital costs. 

TBM system design and operation 

A TBM is a system that provides thrust, torque, rotational stability, muck transport, steering, ventilation, and ground support. In most cases, these functions can be accomplished continuously during each mining cycle. The TBM cutterhead is rotated and thrust into the rock surface, causing the cutting disc tools to penetrate and break the rock at the tunnel face. Reaction to applied thrust and torque forces may be developed by anchoring with braces (grippers) extended to the tunnel wall, friction between the cutterhead/shield and the tunnel walls, or bracing against support installed behind the TBM.

Basic TBM performance parameters. 

TBM system performance is evaluated using several parameters that must be defined clearly and used consistently for comparative applications.  

(a) Shift time. Some contractors will use 24-hr shifting and maintain equipment as needed “on the fly.” As used here, the shift time on a project is all working hours, including time set aside solely for maintenance purposes. All shift time on a project is therefore either mining time when the TBM operates or downtime when repairs and maintenance occur. Therefore, 

Shift time = TBM mining time Downtime 

(b) Penetration rate. When the TBM is operating, a clock on the TBM will record all operating time. The TBM clock is activated by some minimum level of propel  pressure and/or by a minimum torque and the start of cutterhead rotation. This operating time is used to calculate the penetration rate (PR), as a measure of the cutterhead advance per unit mining time. 

Therefore,  

PR = (distance mined)  /  (TBM mining time) 

PR is often calculated as an average hourly value over a specified basis of time (i.e., instantaneous, hour, shift, day, month, year, or the entire project), and the basis for calculation should be clearly defined. When averaged over an hour or a shift, PR values can be on the order of 2 to 10 m per hour. The PR can also be calculated on the basis of distance mined per cutterhead revolution and expressed as an instantaneous penetration or as averaged over each thrust cylinder cycle or other time period listed above. The particular case of penetration per cutterhead revolution is useful for the study of the mechanics of rock cutting and is given the notation PRev (penetration per revolution). Typical values of PRev can be 2 to 15 mm per revolution. 

(c) Utilization. The percentage of shift time during which mining occurs is the Utilization, U

U (%) = [(TBM mining time) / (Shift Time)] × 100, 

and is usually evaluated as an average over a specified time period. It is particularly important that U is reported together with the basis for calculation - whole project (including start-up), after start-up “production” average, or U over some other subset of the job. On a shift basis, U varies from nearly 100 percent to zero. When evaluated on a whole project basis, values of 35 to 50 percent are typical. There is no clear evidence that projects using a reconditioned machine have a lower U than projects completed with a new machine. Utilization depends more on rock quality, equipment condition, commitment to maintenance, contractor capabilities, project conditions (entry/access, alignment curves, surface space constraints on operations), and human factors (remoteness, underground temperature, and environment). 

(d) Advance rate (AR). AR is defined on the basis of shift time as: 

AR = (Distance mined) / (Shift time) 

If U and PR are expressed on a common time basis, then the AR can be equated to: 

AR = (PR (U (%)) / 100 

Advance rate can be varied by changes in either PR   (such as encountering very hard rock or reduced torque capacity when TBM drive motors fail) or in U changes (such as encountering very poor rock, unstable invert causing train derailments, or highly abrasive rock that results in fast cutter wear). 

(e) Cutting rate (CR). CR is defined as the volume of intact rock excavated per unit TBM mining time. The averaging time unit must be defined clearly, and typical values of CR range from 20 to 200 m3 per TBM mining hour.

General considerations for TBM application.                                                

Important project features that indicate use of TBM include low grades (<3 percent preferable for tunnel mucking and groundwater management) and driving up hill. A minimum grade of 0.2 percent is required for gravity drainage  water inflow. Horizontal curves in an alignment can be negotiated by an open TBM with precision and little delay if curve radii are on the order of 40 to 80 m. Most shielded TBMs and back-up systems are less flexible, however, so that a minimum radius of 150 to 400 m should generally be used for design purposes. Tighter curves should be avoided or planned in conjunction with a shaft to facilitate equipment positioning. 

 (1) Experience indicates that tunnel depth has little impact on advance rates in civil projects, providing that contractor has installed adequate mucking capacity for no-delay operation. Therefore, tunnel depth should be chosen primarily by location of good rock. Portal access, as opposed to shafts, will facilitate mucking and material supply, but more important is that the staging area for  either shaft or portal be adequate for contractor staging. Confined surface space can have a severe impact on project schedule and costs. For long tunnels, intermediate access points can be considered for ventilation and mucking exits. However, assuming the contractor has made appropriate plans for the project, a lack of intermediate access may not have a significant impact on project schedule. 

(2) In planning a project schedule, the lead time needed to get a TBM onsite varies from perhaps 9 to 12 months for a new machine from the time of order, to perhaps 3 to 6 months for a refurbished machine, and to nearly no time required for a direct re-use without significant repairs or maintenance. With proper maintenance, used TBMs can be applied reliably, and there is little need to consider specifying new equipment for a particular project. TBM cutterheads can be redesigned to cut excavated diameters different by 1 to 2 m, but the thrust and torque systems should also be modified accordingly. 

(3) With delivery of a TBM onsite, about 3 to 6 weeks will be required for assembly, during which time a starter tunnel should be completed. The start of mining rarely occurs with the full back-up system in place. Decreased advance rates on the order of 50 percent less than for production mining should be expected for the first 4 to 8 weeks of mining, as the back-up system is installed and the crew learns the ropes of system operation.

Sample large-scale modern TBM machines:   

Height of an average person

Mitsubishi Heavy Industries:
15m diameter huge TBM for M30 Highway Road Tunnel in Madid, Spain (2005). This TBM started to excavate a 3.65 km tunnel in April 2006 and finished in October 2006. Excavating speed reached to average 534 m/month and maximum of 802 m/month. The maximum ring number was 23 rings (46 m)/day. This TBM is equipped with 277,000 kN thrust, 85,700 kNm rotary torque, and Maximum 2.4 rpm rotary speed electrically controlled by inverter system. Double erectors with vacuum grip can assemble 10 pieces segments of 15 tons weight/piece within 30 minutes.  Seven backup gantries are provided for cabin, hydaulic power units, VFD, transformers, foam, mortar, bentonite, conveyers, segment feeder, segment crane, quick unloader, ventilation system, fire fighting system, industrial/discharge water system, reels, and others. Total weight of the TBM and BU comes to 4,200 tons. TBM was manufactures by MHI-duro felguera S.A. (joint company of MHI, Japan and DF, Spain).

________________________

TBM growing links: TBM_Links

 

Back to Top of This Page

NOTE: Contact Advanced Technology Consultants for consulting needs and opportunities in this area.


Copyright 2015 - Advanced Technology Consultants- All Rights Reserved

  ** HOMEPAGE ** Why ATC? Technology Service Areas Products/Services Clients News Personnel Contact ATC Images